Four months. I lasted four months before I started planning the next railway.
I know that when I get back to Australia we will likely have space for a model railway, but not necessarily the space for a model railway room, so I've been sketching ideas for a layout that can satisfy my desire to run trains and also be incorporated into a larger layout in future.
The lessons from previous layouts that I've incorporated into this design are:
- reliability of track is paramount for slow-speed running and enjoyment of shunting
- no magnet uncouplers on curves
- train consists can serve more than three industries
- includes a run-around
- limited passenger train operations
- Sydney metropolitan theme
- the layout needs to be able to be incorporated into a bigger layout in future
Here then is the plan:
Long term, I want a shelf layout that goes around the walls of a modestly-sized spare room, with a peninsula terminus in the middle. This layout will serve as a terminus on a peninsula jutting into the centre of the room in future. To future-proof the design above I've reviewed the space I've had available for my layout in all of the houses we've lived in over the last ten years. The average spare room has consistently been around 3m x 3m, so this design will fit in the middle and still leave 50cm of aisle space (albeit with a narrow shelf where the future layout passes perpendicular to the end of this layout) and the ability to join the main line of the future layout with a minimum 24" radius curve.
Back to the plan itself, this part of Sydney was quite rural in character despite being fairly centrally located within the Sydney metropolitan area. Accordingly, the surrounding scenery is going to be grassy and thoroughly populated with weeds. That should help space things out a little too.
My trusty gang of fettlers are going to make an appearance on the bottom-left of the plan as well, necessitating fortnightly visits of the pay bus. There's also a small platform for worker's trains and enthusiast specials to visit.
Anyway, that's my current thoughts. I won't be starting on this until next year most likely, but I wanted to get my thoughts onto the blog to think out loud and confirm for my own piece of mind the track plan, industries, and overall operating concept. I'm still going to tweak it between now and then, but I think it's 95% done.
Hopefully this thought process is useful to someone out there too.
Until next time!
Cheers,
Ben